Projects completed in this sector included:

  Spray system for conditioning tower, line 2

 

  Design and supply of electrohydraulic system for controlling roll tension in the Polysius mass mill. 

 

  Design, supply and installation of the hydraulic system to raise and lubricate the journals in the Norberg  mill.

 

  Overhaul of axial thrust hydraulic system for the clinker cooler.

 

  Design and supply of lubrication system for the Allis Chalmers  primary crusher 

 

  Design and of parallel hydraulic system for rocking the clinker cooler.

 

  Design, improvement and implementation of high efficiency filtering systems for hydraulic and lubrication oils.

 

  Maintenance and repair of the hydraulic and electropneumatic system of the Caricamat  vacuum packer.

 

  Repair and supply hydraulic system for bypass valve in the crusher conveyor.

 

  Supply equipment and implementation of the process required for cleaning , filtering and flushing the hydraulic system on the Loeshe  mass mill.

 

  Set-up, installation and start-up of the hydraulic and pneumatic system in milling, crushing, secondary crushing, receiving building (bypass valve mine belt, limestone yard, (reclaimer-stacker),  additives yard, coal mill, gypsum receiving building. (macro filter - dust collector) clinker truck receiving building, valves for clinker distribution to silos.

 

  Supply and installation of hydraulic units for secondary crushing mills.

 

  Supply of units, hydraulic and pneumatic components and instrumentation connectors for the Tempo project, Line II  (mine, primary and secondary crushing, mixing,  firing, measurement and packaging.) 

 